Broadway, Main and Third Street

Kendall Square Urban Redevelopment Area - Conceptual Streetscape Redesign Project

People moving on Main Street in Kendall Square by foot, bicycle, private vehicle, and public transit.

About the Project

Over past years, many streets in the Kendall Square area have been retrofit or rebuilt, often reducing travel lanes and expanding facilities for pedestrians and bicyclists. The CRA has worked to develop these changes into a coordinated streetscape network throughout the area, and we have now developed conceptual streetscape designs for Broadway (Ames Street to Galaxy Park), Third Street (from Galaxy Park to Binney Street), and Main Street (from Vassar Street to Galaxy Park).

The concept designs established here ensure continuity among any future streetscape reconstruction in the KSURP area. Each team moving forward with these plans over the next few years should refer to the design guidelines, analysis and recommendations included in this document, and remain abreast of the evolving future of Kendall Square. The goal is to connect existing and planned streetscape infrastructure in Kendall Square and holistically incorporate the region’s vision of a multi-modal transportation network with context-specific amenities and landscaping.

This process was conducted in collaboration between the CRA, the City of Cambridge Department of Public Works (DPW), Cambridge Traffic Parking & Transportation (TPT), and the Cambridge Community Development Department (CDD). The designs here were developed with input from property owners, transportation providers, stakeholders, and the community to ensure the designs align with existing uses and future development plans.

A brief highlight of the report’s key outcomes is shared below, and for more information on the process and findings please view the report, available now.


READ THE REPORT

Report by Section


Design objectives

  • Implement separated bicycle facilities where feasible, as per the Bicycle Network Vision and the Cycling Safety Ordinance

  • Accommodate access to new and existing developments

  • Plan around existing and future stormwater and utility infrastructure

  • Preserve and enhance the tree canopy

  • Improve pedestrian and bike infrastructure at intersections

  • Design for bus/shuttle priority and access to Kendall/MIT MBTA Station

  • Design for pick-up/drop-off and commercial loading zones

  • Activate streetscapes with retail


Existing Conditions

Diagrams of Existing Conditions & Movement Patterns through Kendall Square.

 

BROADWAY

Broadway serves as a major east-west connection to and from the Longfellow Bridge to Boston. The section within the study area includes significant tree canopy. It serves as a gateway to the Kendall Square area from Boston.


GOALS ESTABLISHED WITH THE PUBLIC & STAKEHOLDERS

Expand the raised cycle track

Connect into Volpe plans

Preserve existing tree canopy

Reconcile loading zones with pedestrian and cyclist experience

Continue placemaking elements begun at 145 Broadway

Broadway Streetscape: Character/Precedent Images and Section of Proposed Streetscape Concept
 

Third Street

Third Street is a narrower street that serves as a connector between East Cambridge neighborhoods to the north and Kendall Square. The section of Third Street reviewed in this report extends from the intersection of Broadway and Main Street to the south to Binney Street to the north.


GOALS ESTABLISHED WITH THE PUBLIC & STAKEHOLDERS

Integrate intersections of adjacent streets

Create placemaking elements that tie the street together and facilitate both safety (pandemic) and interaction (future)

Expand on the canopy cover

Expand the raised cycle track

 

Main Street

Image of Main Street, busy with buses, cars, and people walking and biking.

Image of Main Street, busy with buses, cars, and people walking and biking.

Main Street was recently reconstructed in 2015. The section of Main Street reviewed in this report extends from the intersection of Vassar and Galileo Galilei Way to its intersection with Third Street and Broadway.

At the heart of this block, where Carleton Street previously connected to Main Street, lies Kendall Plaza and the MBTA headhouses. This space is a central landing point for people arriving at Kendall Square from rapid transit and numerous bus services, and the plaza’s role as a pedestrian hub is only increasing due to the new public stairway accessing the UP Roof Garden and the upcoming opening of Kendall Public Market. With the public easement through the Marriott Hotel connecting to Broadway in the north and the pedestrianized Carleton Street connecting to SoMa buildings and open space to the south, this section of Main Street is a crucial mixing zone for people of all different travel modes.

Through the design process for Main Street, the streetscape area was separated into two sections. The first section includes Main Street west of Ames Street, between Galileo Galilei Way and Ames Street, and the second section includes Main Street east of Ames Street, between Ames Street and Galaxy Park.

For the second section east of Ames Street, three streetscape design options were considered to accommodate bicycle facilities while still accommodating needs for convenient bus service, pedestrian access to Kendall Plaza and the MBTA Headhouse (entrance), customer and loading access to the ground floor retail, and restaurant uses and vehicular access to the south side of the street.


GOALS ESTABLISHED WITH THE PUBLIC & STAKEHOLDERS

Provide a transformative public transit gateway into Kendall Square

Facilitate highest and best mix of pedestrian and transit use

Incorporate separated bicycle facilities

Reconcile need for loading with public realm improvements

Main Street - West of Ames Street


Section of Proposed Main Street Concept, West of Ames Street.

Main Street - East of Ames Street, Option A - Center Bike Lanes

Main Street Character/Precedent Images, including examples from Athens, Georgia, Cambridge Street in Cambridge, Massachusetts, and Sevilla, Spain.

PROS

  • Allows for more curbside pick-up/drop-off, loading, and parking

  • Allows for convenient bus/shuttle loading

  • Allows for more sidewalk placemaking opportunities

  • Existing curbs could remain in the same location

CONS

  • Bicycle signal phase needs to be added at Ames Street to allow bicycles to cross through traffic lanes onto side bike lanes to the west

  • Bicycles need to cross vehicular and pedestrian traffic at raised crosswalks at Galaxy Park onto side bike lanes

  • Potential conflicts between cyclists and pedestrians at mid-block crosswalk could require pedestrians to stop in crosswalk while crossing motor vehicle lanes

  • Bike lanes would separate the open spaces on either side of Main Street making the street less inviting to pedestrians

  • Protection barriers for center bike lanes would prevent left turns into and out of MIT Ford Lot, Dock Street, and Hayward Street

  • Eastbound semi-trailers would not be able to back into MIT Ford Lot without encroaching on center bike lanes.

  • Eastbound semi-trailers would not be able to turn into Hayward Street without encroaching on center bike lanes. Semi-trailers would need to enter SoMa loading entrance on Hayward Street from the south.


Main Street - East of Ames, Option B - Side Bike Lanes

Section of Proposed Main Street Streetscape Concept - Option B, Side Bike Lanes
Main Street Precent images, option b - side bike lanes.

PROS

  • Standard design, easily understood by all users

  • Turning movements into and out of the Ford Lot, Dock Street, and Hayward Street would not be impacted

CONS

  • Increased conflicts between cyclists and pedestrians, especially at bus stops, taxi stand, and mid-block crossing

  • Limited space for pick-up and drop-off, loading, and shuttles

  • Eliminates most parking on the south side of the street

  • Buses would stop in travel lane to pick up passengers

  • As was raised in the Transit Advisory Committee meeting, floating bus stops can be a challenge to make people waiting feel comfortable and need to be large enough to allow for accessible loading and unloading


Main Street - East of Ames, Option C - Woonerf, or Slow Street

Section of Proposed Main Street Concept - Option C, Woonerf or Slow Street

PROS

  • Reduced traffic speeds and volumes would improve safety and comfort of pedestrians

  • Facilitates placemaking opportunities to make Main Street a destination, not just a through route

  • Expanded space for retail outdoor seating

  • Helps to link new open spaces at SoMa project and 325 Main Street

  • Allows for more curbside pick-up and drop-off

  • Turning movements into and out of the Ford Lot, Dock Street, and Hayward Street would not be impacted

  • Provides for enhanced space for bus stops, and eliminates the need for floating bus islands

  • Generally received best support from public and stakeholders in favor of this option

CONS

  • May be confusing to drivers

  • May not be as comfortable for slower or less experienced cyclists

  • Would require review by City Council to confirm compliance with the Cycling Safety Ordinance standards

Character/precedent images for Main Street, option c - slow street.
 

After significant discussion around the three options for Main Street east of Ames, it is clear that further collaboration and study is needed to finalize and select a design direction for the western portion of Main Street. In this study, the three streetscape design concepts offered were discussed and reviewed during public engagement, stakeholder and working group meetings, and each offer benefits to certain modes of transit and curbside uses while creating drawbacks for others. After reflection on community and stakeholder input, however, it is the design team’s recommendation that, for a long-term vision of Main Street, Option C- woonerf, is given primary consideration. This type of design honors Main Street’s evolution as a destination location while facilitating placemaking opportunities for local retailers and businesses. This design was a direct response to community input heard on the original side and center bike lane design options and was well-received by members of the public and stakeholders, as well as the CRA Board. The design team would recommend a slow-street concept only as a complete long-term build and after further traffic study. Before making a firm decision on a design direction, further study is recommended.


PAST Public MeetingS

Cambridge Transit Advisory Committee - April 7, 2021 - presentation

Cambridge Bicycle Advisory Committee - April 14, 2021 - presentation

Broadway / Main / Third Community Meeting - April 28, 2021 - presentation

Cambridge Pedestrian Advisory Committee - April 29, 2021 - presentation

ECPT Presentation - May 12, 2021 - presentation